Sustainable construction high-rise will be a central 30-story mixed-use, the structure will have different coatings. The tower of the life cycle incorporating various materials in its construction. Reinforced concrete is proposed for the basement, first and second floor slab made of wood or concrete slab is proposed from the second floor, the columns of the facade on the second floor until the use of wood or wood , and the core infrastructure is proposed to be constructed from wood or optional concrete floor also with the use of laminated wood (glulam) beams. Precast concrete panels are out of place, helping to reduce the time construction by 50%. Prefabricated
0 comments:
Post a Comment